CHN Energy Dali Binchuan
112.3 MW + 14 MWFull array construction including flexible mounting; approx. 11 months, 1,400+ person-visits.
Utility-scale plants for Chinese state-owned energy groups — the proof of method behind our commercial, industrial and residential work. All projects are in mainland China. Capacities are total plant sizes; where we executed a package or a single specialism, the contracted scope is shown on the card.
Full array construction including flexible mounting; approx. 11 months, 1,400+ person-visits.
Array construction on hilly terrain.
Composite PV station, complete BOS installation.
17 MW package executed (contract extract). Ground-mounted and flexible works.
Site preparation, piling, mounting, modules, inverters and grid connection.
DC cabling, communications and SCADA. 6 personnel, 44 actual days to energisation.
Array construction including ELV; 1 MW across multiple blocks energised in 28 actual working days after rain and material delays.
Full flexible mounting system, access roads and perimeter fencing.
77.7 MW package (contract extract). Elevated arrays over tea, drone logistics block by block.
Elevated array construction for dual land use.
Multi-site agrivoltaic deployment with standardised mounting.
Karst mountain terrain; breaker and DTH combination, continuous survey.
Includes a 50 MW flexible mounting scope across terraced hills.
Aggregate plant capacity: 1,403.8 MW. Flexible mounting: 83.5 MW (Binchuan 14 MW + Tianlin 19.5 MW + Denglongshan 50 MW). Source: company construction record dated 18 November 2026 and contract extracts. Construction methods for each discipline are described on the construction scope page.
A 500 kW roof is a small job to crews who have run 100 MW-class sites. The survey, string design and commissioning discipline do not change.
We have passed the inspection regimes of China's largest state-owned power groups — the documentation standard your lender or insurer will ask for.
Mountain, karst, farmland, tea plantation, high altitude and flexible structures. Awkward roofs and uneven ground are normal work.
ELV and crash programmes: 6 people in 44 days at Chicheng; 28 working days at Xiaohuoshan. We know how to hold a date.
Filmed by our own crews on Yunnan utility sites: material hauling, flexible mounting, drone lifts, cable termination and the walk-through before handover. Clips keep the bilingual captions they were published with; the sound is in Mandarin.
Flexible rows stitched across a cut slope, seen from above.
Where the road ends, modules fly in by drone.
Material to the head of the track, then by hand to the array.
Checked upright before the pour, every post.
Mounting follows the contour instead of fighting it.
Hand excavation where no machine fits.
DC cable dressed and terminated under the box.
Punch list, block by block, before the client signs.
Want a specific process filmed on your own site? We record our own work, so we can show a method rather than describe it.
If your roof, terrain or programme looks like one of these, tell us which. We will send the relevant method statement and resource plan.