Commercial & industrial
Factories, warehouses, cold stores, hotels, hospitals, schools and office buildings. Usually a mix of self-consumption and export, with the array sized to the daytime load rather than the roof area.
- Typical size: 100 kW – 10 MW
- Roof types: metal sheet, concrete, tile, car park canopy
- Grid: behind-the-meter, export-limited or full export
- Mounting: rail, ballast, elevated or carport
- Option: battery for peak shaving or backup