Inspection
Method statements, section-by-section inspection, concealed-work acceptance, material certificates and as-built dossiers. Each stage is signed before the next starts.
We started as a construction team. That is still the centre of the business — and the reason owners trust us with the rest of the chain.
Kunran Power Engineering (Yunnan) Co., Ltd. is based in Kunming and has spent years building photovoltaic plants for China's state-owned power groups. Thirteen utility-scale plants between 19.5 MW and 350 MW, where we executed scopes from a single ELV package to full array construction, across mountain, karst, farmland, tea plantation and high-altitude sites.
Working on those projects put us in daily contact with design institutes, module factories, mounting manufacturers and specialist subcontractors. We saw where projects lose time: a drawing that cannot be built as drawn, a shipment that arrives without the right bolts, a survey error that forces re-drilling. So we built a model that keeps those pieces connected.
Today we deliver design, equipment, construction and O&M through one contract. The construction is ours. The design, equipment and O&M come from partners we select, manage and hold to the same programme.
That model is now pointed at commercial, industrial and residential clients abroad. The plants are smaller, but the logic is the same — and a construction-origin company knows what each step actually costs, which is why the price does not need a trading margin hidden inside it.
Mountain array · Yunnan
Every stage has a named owner. Kunran sits at the centre so the client does not have to manage four contracts and three interfaces.
This is the table we would want a client to read before a site visit. It is also the table we will hand to a due-diligence team.
| Capability | Model | Scope | Responsibility |
|---|---|---|---|
| Construction | Own | Civil, foundations, mounting, modules, electrical, ELV | Kunran |
| Project management | Own | Programme, HSE, quality, interface | Kunran |
| Design | Partner | Feasibility, preliminary and detailed design, structural and electrical calculations, grid connection | Partner institute stamps; Kunran coordinates and reviews constructability |
| Equipment & materials | Integrated | Modules, inverters, mounting, steel, transformers, cables, BOS consumables | Manufacturer warranty; Kunran inspects and consolidates |
| Logistics | Managed | Packing, shipping, documents, customs coordination | Kunran coordinates; Incoterms define the transfer point |
| O&M | Partner | Inspection, cleaning, fault response, spares, training | Partner executes; Kunran manages performance |
| Project finance | Not offered | — | Introductions only |
| Overseas construction licence | Country-specific | Depends on local law | Local partner or locally incorporated entity as required |
Daily briefing · Yunnan
397 long-term core workers, backed by 21 partner crews and roughly 1,200 mobilisable personnel. Teams are organised by trade: survey, drilling, concrete and civil, mounting, modules, ELV, general labour, transformer foundations, and overhead collector lines.
Site management follows a project-manager accountability model with grid-based crews. Each block has a construction supervisor, safety officer and quality inspector. Recruitment, finance and logistics are supported by a 7–11 person operations team in Kunming.
Method statements, section-by-section inspection, concealed-work acceptance, material certificates and as-built dossiers. Each stage is signed before the next starts.
Work can follow IEC 62548, IEC 62446, IEC 60364, IEC 62305 and IEC 61439, plus the grid code of the project country. The applicable edition is fixed in the technical specification.
High-risk work permitting, working-at-height controls, lifting plans, temporary power, fire and environmental controls. We work inside the client's HSE system where one exists.



Scope, capability, references, insurance, payment structure — put them in the first call. It is faster than finding out during due diligence.