Kunran site team
Contact

Send the site. We will send the design.

A roof photo, a recent electricity bill and the country is enough to start. We return an outline system design, a bill of materials and a price — before you commit to a site visit.

Tell us what you need.

Fields marked * are required. The more you tell us now, the faster the outline design comes back.

By submitting you agree that we may contact you about this enquiry. Prefer email? Write to sales@kunranpower.com with photos of the roof or site.

Before you write

Three things that speed up a quote.

1. Photos and a bill

Two or three photos of the roof or land, plus the consumption and tariff page of a recent bill. That is enough to size most systems.

2. What you already have

An existing drawing, single-line diagram or bill of materials. If you have one, we can price supply-only instead of redesigning.

3. The local grid rule

Export allowed or limited? Net metering? Which certificates must the inverter hold? This decides the equipment, not the other way round.

PV array
First contact

Not sure what size you need?

Send the bill and the roof photo. We will tell you the sensible range, the likely annual yield and what it will cost — then you decide whether to go further.