The whole bill of materials. One shipment.
Modules, inverters, cable, mounting, substations and the small parts — bought from the factories that supply utility-scale plants, inspected before they leave, and packed for one delivery to site.
Eight categories. Specified for your site.
We do not stock a catalogue. Each line is chosen against your roof or ground conditions, your grid and your budget, then written into a bill of materials you can check line by line.
| Category | What we specify | Standards / notes |
|---|---|---|
| PV modules | TOPCon, HJT or PERC; 400–700 W+; monofacial or bifacial; framed or glass-glass. | IEC 61215, IEC 61730, CE; destination marks where required. |
| Inverters | String inverters 50–350 kW, three-phase; hybrid-ready models; MV station option for larger plants. | IEC 62109; grid-code firmware matched to the destination country. |
| DC & AC cable | Red and black DC solar cable 4/6/10 mm², AC low-voltage cable, armoured where buried, trays, glands and lugs. | IEC 62930 / EN 50618 for DC; copper or aluminium by design. |
| Mounting & trackers | Fixed and fixed-adjustable steel, single-axis trackers, roof rails and hooks, ballast systems, carport structures. | C4 / C5 corrosion class; structural calculation with wind and snow loads. |
| Flexible steel | Cable-supported large-span structures, posts, anchors, tensioning sets and fittings for agrivoltaic, car park and uneven ground. | Structural calculation and third-party review; galvanising to site conditions. |
| Box transformer / compact substation | 0.8–35 kV packaged substations, ring main units, LV switchgear, protection relays, metering. | IEC 61439, IEC 62271; protection settings coordinated with the utility. |
| Combiner & BOS | Combiner boxes, surge arresters, fuses, MC4 connectors, earthing material, labels, cable ties, cleaning kit. | Matched to string design; one consolidated packing list. |
| Battery & hybrid | LFP racks, battery cabinets, PCS, EMS, fire detection and suppression interface. | IEC 62619; UL 9540 where the destination requires it. |
Brands are proposed per project against the technical requirement, not fixed in advance. Datasheets and certificates are issued with the quotation.
Anatomy of the kit.
Four drawings of what sits inside the parts we specify — the layer stack of a module, how a cable-suspended structure carries its load, what a correct crimp contains, and what is inside a packaged substation. Illustrations, not any one factory's product.
Illustration
Module layer stack
Framed or glass-glass, monofacial or bifacial. The drawing is generic; the datasheet for the exact model comes with the quotation.
- Glass 3.2 mm tempered, low iron
- Cells TOPCon, HJT or PERC; 182–210 mm wafers
- Encapsulant two EVA or POE layers, vacuum laminated
- Backsheet and frame anodised aluminium; junction box IP68
- Standard IEC 61215, IEC 61730
Illustration
Cable-suspended steel
For gullies, agrivoltaic fields and ground that will not take a pile driver. Spans follow the structural calculation, not a catalogue table.
- Posts and anchors hot-dip galvanised steel into concrete or rock
- Main cables tensioned, with turnbuckles and safety pins
- Purlins transverse steel bolted to cable saddles
- Clamps mid and end clamps matched to the module frame
- Finish C4 or C5 corrosion class to site conditions
Illustration
DC connector, MC4-type
The most common field failure on a PV plant is a crimp, not a module. This is what a correct assembly contains.
- Contact tinned copper, crimped with the matching die
- Seal silicone O-ring, IP68 when mated
- Locking snap clip with a release-tool slot
- Housing UV-stabilised PC/PA; red for positive
- Cable 4 / 6 / 10 mm² to IEC 62930
Illustration
Packaged substation
One enclosure that takes the voltage down to the inverter or the grid interface, with protection and metering inside.
- MV compartment ring main unit or switchgear, IEC 62271
- Transformer dry-type, naturally or force ventilated
- LV panel distribution and outgoing feeders, IEC 61439
- Protection and metering relays, CTs, utility-compliant settings
- Enclosure steel with louvres, IP-rated to site
These are explanatory drawings made for this page, not photographs of a particular supplier's product. Model datasheets, certificates and production-line footage are supplied with the quotation.
See the lines we buy from.
Production line footage and photos for each category — module lamination, inverter assembly, cable extrusion, steel fabrication. Ask for the current clip and we will send it with the quotation.
PV modules
Line video, IEC certificates and the datasheet of the exact model quoted.
Inverters
Assembly and test footage, plus the grid-code certificate for your country.
DC & AC cable
Extrusion, marking and drum packing, so the site receives cut lengths, not surprises.
Mounting & flexible steel
Cutting, welding, drilling and hot-dip galvanising, with the structural calculation.
Factory price, stated fee. No hidden rebate.
Most trading companies earn on the gap between the factory price and what you are told. We show both lines: the factory price, and a stated handling fee for inspection, consolidation, documents and logistics. You can price-check us against any supplier.
- Direct from the manufacturer. No layer of agents between the line and your site.
- One consolidated shipment. Modules, steel, cable and BOS arrive together, on one document set.
- Nothing missing. Bolts, MC4, earthing and labels are packed against the BoM, not improvised on site.
- Inspection before payment. Pre-shipment inspection report and photos before the balance is released.
Quality control, step by step
- Factory licence, production capacity and export certificates checked
- Factory audit: key processes, test equipment, incoming material
- In-process checks at agreed hold points, with photo records
- Pre-shipment inspection to AQL; BV or SGS on request
- Certificates matched to the exact model and destination
- Sea-worthy packing: moisture, salt-spray and impact protection
- Shipping documents: packing list, invoice, B/L, CO / Form E, insurance
Already have a design and a BoM?
Send the last page of your bill of materials and we will price it as a supply-only package — no design fee, no obligation to use our installation crew.