From survey stakes to energisation.
The utility-scale construction methods behind our C&I and residential work. Take the whole chain or a single package. The scope is written down, the interface is agreed, and the stage you give us has a named owner.
Civil & foundations
Clearing, survey, drilling, piles, concrete, roads, drainage and fencing.
Mounting & modules
Fixed, adjustable and flexible structures, module placing and string wiring.
Electrical & ELV
DC cabling, combiners, inverters, box substations, collection lines, SCADA.
Commissioning & O&M
Testing, grid acceptance support, inspection, cleaning and training.
Handheld drilling · steep terrain
Foundations that survive the ground you actually have.
Mountain, karst, farmland and tidal flats behave differently. We choose the drilling method from the ground condition, not from a standard detail — and we survey continuously so piles are cast right the first time.
- Clearing, control-point verification and GPS stakeout: 800–2,000 points per station per day.
- DTH drilling: 210–240 holes per shift in rock; 760–840 per shift in soil, with four rigs.
- Handheld drilling: 50–80 holes per machine per day where plant cannot reach.
- Rebar cages, anchor bolts, C35 concrete from a 750-type batching plant, transformer and equipment foundations.
- Access roads, drainage, retaining walls, slope protection and perimeter fencing.
Module installation · agrivoltaic
200 arrays a day, with the punch list closed.
Mounting is checked before modules are released to the block. Modules are inspected on arrival. That sequence is why we do not carry a rework tail into commissioning.
- Fixed-tilt, fixed-adjustable and single-axis tracker installation.
- 60–80 installers producing around 200 finished arrays per day.
- 3–5 drones moving structures and modules between blocks where roads are inadequate.
- Module unpacking and inspection on arrival; string wiring and MC4 termination.
Array electrical works · Yunnan
The last 5% that decides the COD.
DC cabling, communications and SCADA are where programmes slip. We treat ELV as a critical-path activity that follows the array block by block, not as punch-list work at the end.
- DC cabling, combiner boxes, string inverters, box-type substations.
- MV collection lines, earthing, lightning protection and fire sealing.
- Communications, monitoring and SCADA integration.
- Insulation and earth-resistance testing, pre-energisation checks, commissioning support.
- Reference: Chicheng 150 MW project — 6 personnel, 44 actual working days to energisation.
Denglongshan · 50 MW flexible scope
Long spans for land you cannot flatten.
Cable-supported structures let arrays cross gullies, farmland and uneven ground with fewer foundations. We have installed 83.5 MW of flexible mounting across three projects.
- Posts, cable systems, anchors and prestressed tensioning.
- Total-station level control throughout erection, so piles are cast once and correctly.
- Reference projects: Binchuan 14 MW, Tianlin 19.5 MW, Denglongshan 50 MW.
- Suitable for farmland, tea plantations, tidal flats and desert sites.
What a full package contains.
| Ref | Work section | Content |
|---|---|---|
| A | Site clearing & survey | Clearing, control-point verification, GPS stakeout, pile-position checking, as-built survey |
| B | Foundations | Mechanical and handheld DTH drilling, bored piles, rebar cages, anchor bolts, concrete, transformer and equipment foundations |
| C | Site civil works | Access roads, drainage, perimeter fencing, retaining walls, slope protection |
| D | Mounting structures | Fixed-tilt, fixed-adjustable and flexible systems, including posts and prestressed tensioning |
| E | Module installation | Hoisting, placing, string wiring, MC4 termination |
| F | Electrical & ELV | DC cabling, combiners, inverters, box substations, MV collection lines, earthing, fire sealing, communications and SCADA |
| G | Testing & commissioning | Sub-system testing, insulation and earth resistance, pre-energisation checks, as-built documentation |
| H | Special services | Crash programmes, labour supply, single-package subcontracting (foundations / flexible / ELV) |
What we do not do.
Being clear about exclusions protects both sides. Unless separately agreed in writing, the following are outside our scope:
- Project finance and investment.
- Land acquisition, permits, tariffs and grid connection agreements.
- Operation of the plant outside a separately contracted O&M agreement.
- Design responsibility unless a design package is expressly included and issued by the partner institute.
Checks before the shipment, not after.
| Factory | Licence, capacity, certifications, quality system |
| Production | Key-stage inspection with photo and video records |
| Pre-shipment | AQL sampling; BV/SGS third-party inspection on request |
| Certification | IEC 61215/61730, IEC 62109, IEC 62817, CE, UL, national marks |
| Packing | Sea-worthy, moisture, salt-spray and shock protection |
Certification requirements are confirmed against the destination country before the order is placed.
Give us one package. We will price it properly.
Send the drawings, BOQ or a description of the site. We will tell you what we can self-perform, what needs a partner, and where the programme risk sits.