Down-the-hole drilling rig on a mountain PV site
Construction scope

From survey stakes to energisation.

The utility-scale construction methods behind our C&I and residential work. Take the whole chain or a single package. The scope is written down, the interface is agreed, and the stage you give us has a named owner.

A

Civil & foundations

Clearing, survey, drilling, piles, concrete, roads, drainage and fencing.

B

Mounting & modules

Fixed, adjustable and flexible structures, module placing and string wiring.

C

Electrical & ELV

DC cabling, combiners, inverters, box substations, collection lines, SCADA.

D

Commissioning & O&M

Testing, grid acceptance support, inspection, cleaning and training.

Handheld drilling on a steep slope Handheld drilling · steep terrain
01 · Civil works

Foundations that survive the ground you actually have.

Mountain, karst, farmland and tidal flats behave differently. We choose the drilling method from the ground condition, not from a standard detail — and we survey continuously so piles are cast right the first time.

  • Clearing, control-point verification and GPS stakeout: 800–2,000 points per station per day.
  • DTH drilling: 210–240 holes per shift in rock; 760–840 per shift in soil, with four rigs.
  • Handheld drilling: 50–80 holes per machine per day where plant cannot reach.
  • Rebar cages, anchor bolts, C35 concrete from a 750-type batching plant, transformer and equipment foundations.
  • Access roads, drainage, retaining walls, slope protection and perimeter fencing.
PV modules mounted above agricultural ground Module installation · agrivoltaic
02 · Mounting & modules

200 arrays a day, with the punch list closed.

Mounting is checked before modules are released to the block. Modules are inspected on arrival. That sequence is why we do not carry a rework tail into commissioning.

  • Fixed-tilt, fixed-adjustable and single-axis tracker installation.
  • 60–80 installers producing around 200 finished arrays per day.
  • 3–5 drones moving structures and modules between blocks where roads are inadequate.
  • Module unpacking and inspection on arrival; string wiring and MC4 termination.
PV array with electrical works in progress Array electrical works · Yunnan
03 · Electrical & ELV

The last 5% that decides the COD.

DC cabling, communications and SCADA are where programmes slip. We treat ELV as a critical-path activity that follows the array block by block, not as punch-list work at the end.

  • DC cabling, combiner boxes, string inverters, box-type substations.
  • MV collection lines, earthing, lightning protection and fire sealing.
  • Communications, monitoring and SCADA integration.
  • Insulation and earth-resistance testing, pre-energisation checks, commissioning support.
  • Reference: Chicheng 150 MW project — 6 personnel, 44 actual working days to energisation.
Large-span PV arrays across terraced terrain Denglongshan · 50 MW flexible scope
04 · Flexible mounting

Long spans for land you cannot flatten.

Cable-supported structures let arrays cross gullies, farmland and uneven ground with fewer foundations. We have installed 83.5 MW of flexible mounting across three projects.

  • Posts, cable systems, anchors and prestressed tensioning.
  • Total-station level control throughout erection, so piles are cast once and correctly.
  • Reference projects: Binchuan 14 MW, Tianlin 19.5 MW, Denglongshan 50 MW.
  • Suitable for farmland, tea plantations, tidal flats and desert sites.
Work breakdown

What a full package contains.

RefWork sectionContent
ASite clearing & surveyClearing, control-point verification, GPS stakeout, pile-position checking, as-built survey
BFoundationsMechanical and handheld DTH drilling, bored piles, rebar cages, anchor bolts, concrete, transformer and equipment foundations
CSite civil worksAccess roads, drainage, perimeter fencing, retaining walls, slope protection
DMounting structuresFixed-tilt, fixed-adjustable and flexible systems, including posts and prestressed tensioning
EModule installationHoisting, placing, string wiring, MC4 termination
FElectrical & ELVDC cabling, combiners, inverters, box substations, MV collection lines, earthing, fire sealing, communications and SCADA
GTesting & commissioningSub-system testing, insulation and earth resistance, pre-energisation checks, as-built documentation
HSpecial servicesCrash programmes, labour supply, single-package subcontracting (foundations / flexible / ELV)
Exclusions

What we do not do.

Being clear about exclusions protects both sides. Unless separately agreed in writing, the following are outside our scope:

  • Project finance and investment.
  • Land acquisition, permits, tariffs and grid connection agreements.
  • Operation of the plant outside a separately contracted O&M agreement.
  • Design responsibility unless a design package is expressly included and issued by the partner institute.
Quality control

Checks before the shipment, not after.

FactoryLicence, capacity, certifications, quality system
ProductionKey-stage inspection with photo and video records
Pre-shipmentAQL sampling; BV/SGS third-party inspection on request
CertificationIEC 61215/61730, IEC 62109, IEC 62817, CE, UL, national marks
PackingSea-worthy, moisture, salt-spray and shock protection

Certification requirements are confirmed against the destination country before the order is placed.

PV modules
Scope discussion

Give us one package. We will price it properly.

Send the drawings, BOQ or a description of the site. We will tell you what we can self-perform, what needs a partner, and where the programme risk sits.