Commercial & industrial
100 kW – 10 MW. Factory and warehouse roofs, car parks, cold stores, campuses. Self-consumption, grid export or both.
Kunran designs, supplies, installs and maintains PV systems for businesses and homes — one contract from load study to commissioning. The same crews have worked on 1,403.8 MW of utility-scale plants for Chinese state-owned energy groups.
Every system starts with your load profile, your roof or land, and your bill — not with a module datasheet. We size the array, choose the equipment and quote a fixed scope.
100 kW – 10 MW. Factory and warehouse roofs, car parks, cold stores, campuses. Self-consumption, grid export or both.
3 – 20 kW. Pitched and flat roofs, tile hooks or ballast, tidy cable routes and a handover pack the homeowner can keep.
1 – 20 MW. Owned or leased land, fixed or adjustable mounting, grid-tied. The smaller brother of what we build for utilities.
PV + battery. For weak grids, night load and backup. Sized on your consumption curve, with the inverter and BMS matched to the array.
112.3 MW · CHN Energy, Dali Binchuan
A 5 MW factory roof and a 150 MW utility array are the same trade at different sizes: string design, structural loads, DC/AC protection, commissioning, documentation. We have done the hard version on mountain terrain for state-owned owners. Your project is not where we learn.
Our own films from Yunnan mountain plants: drone lifts where the road gives out, flexible steel following the contour, cable terminated under the box, every post checked before the pour.
We buy from the factories that supply utility-scale plants, inspect before shipment, and ship the full bill of materials together — including the small parts that stop a crew for a day when one is missing.
Send the site details and a recent electricity bill. We return a system design, a bill of materials and a fixed price — then build to that scope.
Site, load, bill and target date — through the form, email or WhatsApp.
Roof or land check, shading, structural and grid conditions.
Layout, single-line diagram, bill of materials, fixed quotation.
Supply, installation, testing, commissioning and documentation.
Thirteen plants across Yunnan, Guangxi, Guizhou and Hebei for China's largest energy groups. Capacities are total plant sizes; our contracted scope is stated separately.
Composite array plus a flexible mounting system, delivered over roughly 11 months with 1,400+ person-visits.
Elevated arrays over tea plantations, with drones moving structures and modules block by block.
Agriculture-forestry PV across terraced hills, including a 50 MW flexible mounting scope.
Due diligence will ask. We prefer to answer before it does.
| Capability | Model | What it means |
|---|---|---|
| Construction | Own | 397 core workers, 21 partner crews, owned survey and drilling plant. |
| Project management | Own | Project manager, site engineers, safety and quality officers on our payroll. |
| Design | Partner | Issued and stamped by partner design institutes; Kunran handles inputs, coordination and constructability review. |
| Equipment & materials | Integrated supply | Direct from manufacturers; Kunran manages specification, inspection, consolidation and documents. |
| O&M | Partner | Delivered by a managed O&M team; Kunran remains the single interface. |
| Finance | Not offered | We can help introductions, but we do not provide project finance. |
Full boundary statement in the company profile. Values shown are plant capacities unless stated as a package.
Tell us the country, roof or land area, consumption and target date. We will return an outline design, a bill of materials and the questions we need answered before a fixed price.